ChinaGoGlobal
Manufacturers

Sourcing equipment, components and raw materials in China for manufacturers

For a manufacturer, a sourcing mistake costs more than for a shop: the wrong machine configuration, incompatible components, raw material off-spec. Our Chinese team member handles technical correspondence with Chinese plants, request drawings and certificates, verify the manufacturer and accept the equipment before dispatch — so exactly what you ordered arrives at your workshop.

What usually gets in the way

What usually gets in the way

Technical communication

Specifications, tolerances and standards get lost in translation. You need someone who understands both the engineer and the plant.

Equipment acceptance

A machine must be checked before dispatch — at the plant, with a test run on video.

Oversized cargo

Equipment and raw materials mean tonnes and cubic metres. You need the right packing, truck, rail or sea, and documents.

How we help

How we help

We shortlist plants

We find manufacturers of equipment and components and request specs, drawings and certificates.

Learn more

We verify the manufacturer

License, real capacity, export experience. A plant visit with video using your list of questions.

Learn more

We ship and clear

Truck, rail from 1 tonne, sea. Customs clearance and documents for the equipment.

Learn more
What it looks like in practice

What it looks like in practice

  1. 01

    Specification

    You send specs, a drawing or a photo of an analogue. We clarify requirements and budget.

  2. 02

    Plants and quotes

    We shortlist 2–4 manufacturers and obtain commercial offers and technical documentation.

  3. 03

    Verification and acceptance

    We verify the plant, control manufacturing and accept with a test run.

  4. 04

    Shipping

    Transport packing, truck, rail or sea, customs clearance and documents.

Shipping

Delivery times from our warehouses in China

Times are approximate and counted from dispatch at the warehouse in China. Sea freight — on request.

Fastest

Air

2–3 days

The fastest option — for urgent and small batches, samples and valuable goods. From 2 kg.

Calculate

Road

7–10 days

The balance of price and speed — suits most shipments. From 10 kg.

Calculate

Truck

10–14 days

For large batches — per kilogram it can work out cheaper. From 10 kg.

Calculate
Usually cheapest

Rail

20–30 days

The most economical option for heavy and bulky cargo when there's no rush. From 1 tonne.

Calculate
Questions

Frequently asked questions

Yes. From a photo, model number or specs we find Chinese manufacturers of equivalents and compare parameters and prices.

We visit the plant, check the configuration against the spec, film a test run, and record the packaging. You approve dispatch based on the report.

We arrange contact with the plant's engineers for consultations and, if needed, a specialist visit — terms are agreed individually.

Request

Get a sourcing quote

Describe what you want to bring from China — a manager will clarify the details and send a quote for goods, services and shipping.

  • We reply on WhatsApp during working hours
  • The quote is free and non-binding
  • No product link needed — we can find a supplier for you

or message us directly

WhatsApp+7 707 543 53 03

By clicking the button, you agree to the processing of your personal data.